Project requirements
PROJECT REQUIREMENTS
☆The assembly line can meet the assembly inspection requirements for P-EPS steering gears with and without tie rods.
☆ All in-line stations meet the assembly requirements of the left and right rudder steering gear assemblies.
Project Benefits
PROJECT ADVANTAGE
☆The assembly line is equipped with a quality traceability system, which has a bar code traceability function to trace the product information.
☆ The inspection station only needs to manually clamp the workpiece, and all inspection processes are fully automated.
☆ Fixture design meets interchangeability and versatility, fixture replacement time ≤ 15 minutes.
Main station
MAIN WORK STATION
☆ Servo press special plane
☆ worm gear clearance detection and grouping machine
☆ EPS steering unit automatic alignment machine
☆Automatic gap detection and adjustment machine
☆ EPS sensor calibration plane
☆ Positive and negative term automatic running machine
☆ Assembly performance testing machine
Technical parameters and configuration
TECHNICAL PARAMETERS
AND CONFIGURATION
☆ equipment beat / CT: 30-45 seconds
☆ Control System: SIEMENS
☆ Pneumatic system: SMC.